Compounds & Haul Roads, New Build Development, Ipswich

Project overview
Spectra was contracted to construct 2.1 km of haul roads and the related site compounds for a major new housing project near an active Network Rail line. This phase was vital because it created safe and robust access routes for the subsequent installation of vehicular and pedestrian bridges.
Approach and delivery
The haul roads were constructed with a width of 4 metres and a depth of 640mm, ensuring durable access on both sides of the railway. Additionally, Spectra erected four temporary compounds, each fitted with pile mats to support crane operations for bridge installation and heavy lifting. In addition to the main access routes, the project included installing Heras-on-post tree protection systems, secure access gates, and noise reduction screens to safeguard the environment and meet local regulations. All activities were carefully coordinated to keep the project on schedule and minimise disruptions to the surrounding area.
Outcome
The project was completed within the scheduled six-week timeline and remained within budget. The infrastructure provided guaranteed the client safe, reliable, and fully compliant access routes, enabling the wider development to proceed without delays.
On site


Related projects
Same disciplines, different settings. A sense of how we run this kind of work elsewhere.
Talk to Us About Your Project
If this looks like the work in front of you, tell us the site and the constraints and we will tell you how we would run it.
Contact Spectra today for trusted expertise in asbestos, demolition, fire protection, and environmental safety.
Prefer to speak to someone now? Call 01268 534380.